Too many PPMs turn into problem-finding sessions instead of alignment sessions. A missing trim, an unresolved compliance question, a costing item still marked "TBC" — none of that should be news in the meeting. It should already be resolved, or already flagged with a plan attached. We run every program against a fixed set of risk categories well before the meeting gets scheduled.

"The PPM is meant to align on how a style gets built — not to discover, in the room, that it can't be."

6
Risk categories cleared first
1
Meeting, zero surprises
0
Open items marked "TBC"

Six Risk Categories to Clear First

01
Fabric
Fabric Risk
Bulk fabric approved against lab dips and the physical standard — not just the swatch from development.
02
Trims
Trim & Accessory Risk
Every trim on order, on hand, or confirmed in transit — a missing zipper pull delays the whole line.
03
Construction
Construction & Pattern Risk
Pattern, grading, and construction methods proven on a pre-production sample, not just the fit sample.
04
Compliance
Compliance Risk
Restricted substances, labeling, and certification requirements cleared for the destination market.
05
Timeline
Capacity & Timeline Risk
Line allocation confirmed against the shipment date — not assumed from a quoted lead time.
06
Costing
Costing Risk
Final costing locked against the approved bulk fabric and trims — no open items still "TBC."

What the Factory Needs to Keep in Mind

The PPM Is a Confirmation, Not a Negotiation
Open questions raised for the first time in the meeting signal the factory wasn't ready — flag them earlier.
Every Department Needs the Same Spec Pack
Cutting, sewing, and QC working from different tech pack versions is the single biggest cause of bulk defects.
Raise Risk Early, Not Diplomatically
A factory that surfaces a real risk two weeks out is more valuable than one that stays quiet to avoid the conversation.
The PP Sample Is the Last Checkpoint
Once bulk cutting starts, fixes get expensive fast — the PP sample is where every risk should already be resolved.

How We Run It

We Build a Risk List, Not Just an Agenda

Every PPM we run starts from a written risk register — fabric, trims, construction, compliance — so nothing surfaces as a surprise mid-meeting.

We Insist on a Physical PP Sample

A photo isn't enough. We require an in-hand pre-production sample checked against bulk materials before signing off on any PPM.

Silence From a Factory Is a Red Flag

A factory with zero open questions before a complex style hasn't reviewed the pack closely enough. We push until real risks surface.

Want Your Next PPM to Be a Formality, Not a Fire Drill?

We build the risk register before the room gets booked — so the meeting confirms readiness instead of exposing it.